Current Projects
2021
- Methods to Identify Product Placement Behind Pipe & Identify Drilling Practices to Optimize Well Integrity with Primary Cementing
- Identify GHG Level for Well Repair and Monitoring of Sweet Natural Gas Wells to Identify Acceptable Leak Rate
2020
- Testing Alternative Products for Well Remediation and Decommissioning / Abandonment – Phase I
- Plug and Abandon Strategies for Canada’s Oil & Gas Wells to stop Surface Casing Vent Flow (SCVF) and Gas Migration (GM)
- Multi-Year Compositional, Isotopic and Microbial Investigation of Methane Migration Issues to Develop “Best-Practices” for Industry
- Minimum Acceptable Emissions and Closure Guidelines for Leaking Abandoned Wells
2019
2017-2019
Completed Projects
2018
- Plug/Annular Cement Integrity Analysis and Fault Diagnosis of Mechanical Plugs
- Identifying Regional Variation in the Source Depths of Migrating Gas from Conventional and Unconventional Wells in the Western Canadian Sedimentary Basin
- Chemical Cement Alternatives
2017
2016-2019
2016
- Fluid mechanic causes of gas migration
- Application of Distributed Sensing for enhanced determination of Surface Casing Vent Flow (SCVF)
2015